Revolutionary new Tampa International Airport terminal is completed

On April 14, 1971, Florida Governor Reubin Askew officially dedicated Tampa International Airport’s spectacular new $80 million terminal complex, hailed as one of the most modern airports in the world. The following morning, the airport began operations, introducing a revolutionary new concept in airport design that would attract international attention and influence the development of airport terminals for decades to come.

The opening represented a milestone in Tampa’s long effort to establish itself as a major aviation center. As early as the 1920s, Tampa had sought to develop its municipal airport facilities and attract commercial air service. In 1927, the city negotiated to lease 160 acres from developer John H. Drew for a new municipal airport, establishing the airfield that would eventually become Tampa International Airport.

During the 1930s and 1940s, Tampa repeatedly sought to expand its commercial aviation connections, particularly with Cuba. Pan American Airways inaugurated Tampa–Havana service in December 1933, but discontinued the operation in April 1935. Following World War II, National Airlines received federal authorization to operate the route and inaugurated Tampa–Havana service in December 1946, when Drew Field was celebrated as Tampa’s international airport.

Throughout these years, Tampa had struggled to develop the facilities and airline connections necessary to compete with Miami, which had emerged as the nation’s principal gateway to Latin America. By 1971, however, Tampa was about to unveil an airport terminal that would surpass Miami’s existing facilities in several important aspects of design and passenger convenience.

A new concept in airport design

The culmination of more than eight years of study, planning and construction by the Hillsborough County Aviation Authority, Tampa’s new airport was designed specifically to meet the challenges of the rapidly expanding jet age. Its most revolutionary feature was an entirely new approach to moving passengers between the main terminal and their aircraft. Rather than requiring passengers to walk long distances through sprawling concourses, Tampa introduced a landside/airside terminal concept, separating passenger processing facilities from the areas where aircraft were parked. The enormous, one-million-square-foot central terminal accommodated ticketing, baggage handling, parking, restaurants, shops and other passenger services. Four separate airside satellite terminals, averaging approximately 200,000 square feet each, provided aircraft boarding and arrival facilities.

Connecting the central terminal with the satellites was the world’s first automated airport passenger shuttle system, developed by Westinghouse. Electrically operated shuttle cars, each capable of carrying more than 100 passengers, traveled approximately 1,000 feet between terminals in less than a minute. The system eliminated the long walks increasingly associated with large airports. Officials proudly boasted that no passenger would have to walk more than 700 feet between leaving a car and boarding an aircraft.

The terminal’s vertically arranged passenger facilities further improved efficiency, separating arriving and departing passengers and simplifying the movement of baggage and automobiles. The result was an airport designed around passenger convenience, with the automated shuttle system integrated into its architecture from the outset.

Planning for the future

Designed with the assistance of aviation consultants Leigh Fisher Associates of San Francisco and engineering consultants J. E. Greiner Co., the new terminal complex was intended to accommodate substantial future growth without sacrificing efficiency. Construction began on October 16, 1968. The initial facilities were designed to handle approximately 8–10 million passengers annually, compared with the roughly 3.1 million passengers then using Tampa’s airport. Future expansion, including two additional airside satellites, was expected to increase capacity to 12–15 million passengers annually.

The airlines themselves participated in developing the new facilities. National Airlines, a major operator at Tampa, invested approximately $5.5 million in its own airside terminal, incorporating a distinctive Y-shaped configuration intended to reduce passenger walking distances and improve aircraft ground operations.

The new terminal also positioned Tampa to accommodate the anticipated expansion of Florida tourism. Its opening came just six months before Walt Disney World welcomed its first visitors near Orlando in October 1971, ushering in a new era of tourism growth in Central Florida.

An innovation that attracted worldwide attention

Tampa’s revolutionary terminal design attracted the attention of airport planners from around the world, who studied its approach to accommodating increasing numbers of passengers and larger jet aircraft.

Westinghouse celebrated its achievement in a full-page advertisement published in the Tampa Tribune on April 11, 1971, proclaiming, “After Tampa, airports will never be the same.” The advertisement’s accompanying message captured the innovation perfectly: “Any airport can get the passenger off the ground. Tampa gets him to the plane.”

The Westinghouse system demonstrated the practical application of automated passenger transportation within an airport, an innovation that would subsequently be adopted in various forms at major airports throughout the United States and overseas.

Tampa’s achievement extended beyond the shuttle technology itself. Its integrated landside/airside concept demonstrated how airport terminals could accommodate expanding traffic while minimizing walking distances, reducing congestion and improving the passenger experience.

For Tampa, the opening represented the culmination of decades of effort to establish the city as a major aviation center. Although Miami remained Florida’s dominant international aviation gateway, Tampa had become a pioneer in airport design and technology. When Tampa International Airport opened in April 1971, it was not merely one of the world’s most modern airports. It had helped establish a model for the airports of the future.

Principal historical source: The Tampa Tribune, April 11, 1971, coverage of the dedication and opening of Tampa International Airport, including contemporary reporting on the terminal’s planning, construction and Westinghouse automated passenger shuttle system.